







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterCabinets & Countertops in San Francisco, CA
Cabinet and countertop replacement in San Francisco typically runs $9,500 to $28,000 for a full kitchen, depending on box construction, door style, counter material, and whether the layout changes. It is the one part of a kitchen remodel most homeowners can actually see, touch, and use every day, which is why we measure twice and write the number down before anyone touches a screwdriver. Rowan Construction Group San Francisco handles cabinets and countertops as a focused piece of Kitchen Remodeling in San Francisco, with a flat written price and a written scope before work starts.
Most of the kitchens we walk into in San Francisco share a set of problems. The cabinets are original to a 1920s Edwardian or a 1950s ranch house, the doors don’t close square, and the counter is a slab of tile with grout lines that have been holding onto grease since the Clinton administration. Or the previous owner put in big-box cabinets that swelled at the toe kick after one wet winter in the fog belt. There’s a real trade here, and it rewards knowing the difference between a $400 cabinet and a $1,200 cabinet before you sign anything.
Call (844) 797-6388 and we’ll set up a walk-through. Under Clause 1 of the Haven Standard, the price is written before anyone starts – no “call for a quote,” no verbal estimate that grows legs once the boxes arrive.

When You Need Cabinets & Countertops
There’s no single trigger. Some of these are obvious, some you only notice when you’re standing at the sink at 7am and the light hits the counter at the wrong angle.
- Doors that no longer sit flush. In older San Francisco homes, the humidity swings between the foggy Outer Sunset and the warmer Mission create seasonal movement. Particleboard boxes that swelled and never went back are common, especially under sinks where a slow drip went unnoticed for a year.
- Countertop seams that have gone dark or chalky. Laminate from the 1990s delaminates at the seam; tile grout in a kitchen counter is a sponge for oil and coffee. Once a countertop seam starts holding onto stains, no amount of scrubbing gets it back.
- A kitchen layout you’ve quietly stopped using. If you’ve been prepping on the dining table because the counter run near the range is too short, that’s a real problem with a real fix. Cabinet and countertop replacement is often how people reclaim a galley kitchen without moving walls.
- You’re selling in the next 12-24 months. Buyers in San Francisco read cabinet and countertop condition as a proxy for how the rest of the house was kept. Worn cabinets read as deferred maintenance, even when the plumbing and electrical are current.
- Water damage under the sink or at the dishwasher. We find this on a meaningful number of walk-throughs. The cabinet box holds the moisture, the countertop hides it, and by the time it’s visible the fix is a cabinet run, not a cabinet door.
- You want stone but the budget doesn’t. Quartz and engineered stone from Cambria and similar lines now sit within reach of a mid-range budget. The old assumption that stone means $20,000 is out of date.
Our Cabinets & Countertops Process
We’ve run this sequence hundreds of times. It’s boring on purpose – boring processes are what keep projects within a few percent of the agreed cost.
- Walk-through and measurement. We come out, measure the existing layout to the sixteenth of an inch where it matters, and note the condition of what’s there: substrate, plumbing rough-in, electrical for the range and dishwasher, and whether the wall behind the backsplash is square. We also note the cabinet box construction and whether the current layout has code issues we’ll need to address.
- Written price and written scope. You get a flat number, a scope that names the cabinet line, the door style, the counter material, and the edge profile, and a written warranty. No vague allowances. If we name KraftMaid or Wellborn, we also name the specific line and finish grade we quoted.
- Material selection. We work with a set of vetted sources across the cabinet and countertop categories – KraftMaid and Wellborn for cabinets, Cambria and similar quartz lines for counters. You’ll see samples, feel the door, and compare chrome vs. satin nickel before anything is ordered.
- Demo and protection. Floors are covered, appliances are moved and protected, and the work zone is sealed off. The photo record starts here, included as standard, not an upgrade.
- Installation. Cabinet boxes are set level and shimmed, doors and drawers are adjusted, countertops are templated on-site for stone, and the slab goes down with seams placed where they’ll be least visible. Under-cabinet lighting, filler panels, and toe kick are finished before we call it done.
- Final walk-through and photo record. You walk the kitchen with us, we hand over the photo record, and we cover what the 365-Day Done Right Promise means in practice. If something isn’t right within that year, we fix it.
If you’ve already got a quote from another contractor, we’ll review it line by line at no charge. That’s the Free Second Opinion offer, and it’s genuinely useful – people often find an allowance on a countertop quote that was never going to cover the actual square footage.

Cabinet & Countertop Pricing in San Francisco
Honest pricing is the whole point of writing this section. Here’s what we see on real San Francisco jobs. Ranges below are for the cabinet and countertop work itself, not the full kitchen remodel.
| Item | Typical Range | What moves the number |
|---|---|---|
| Stock / semi-custom cabinet boxes (per linear foot, installed) | $400 – $850 | Box material, door style, drawer hardware |
| Custom cabinetry (per linear foot, installed) | $900 – $1,600 | Face-frame vs. frameless, inset doors, finish |
| Laminate countertop (per square foot) | $35 – $65 | Edge profile, backsplash integration |
| Quartz countertop (per square foot, installed) | $70 – $130 | Slab selection, edge profile, seam count |
| Under-sink cabinet replacement (single run) | $600 – $1,400 | Water damage extent, plumbing rework |
| Full cabinet + quartz countertop package, typical SF kitchen | $9,500 – $28,000 | Layout changes, appliance panels, lighting |
Three things reliably push a project toward the top of that range. First, layout changes: moving the sink or range means plumbing and electrical, and that adds real hours. Second, wall condition: in older San Francisco homes, we often find lath-and-plaster behind the old backsplash that needs repair before anything new goes up. Third, cabinet height or depth changes: going to full-height uppers or deeper boxes changes the countertop template and the backsplash, both of which are priced separately on a good quote.
The number we quote is the number you pay. If we open up a wall and find something we didn’t anticipate, we stop, document it, and write a change order. No work proceeds on that change until you sign it. That’s the discipline that has kept projects within a few percent of the agreed cost across more than 4,000 jobs since 2007.
Call (844) 797-6388 for a free estimate. We’d rather spend an hour walking your kitchen now than surprise you with a change order later.
The Details That Matter in San Francisco Kitchens
A few things we’ve learned about this city specifically, because they don’t apply everywhere.
Fog and humidity at the cabinet box. Kitchens on the western side of the city deal with more ambient moisture than kitchens in Noe Valley or Bernal Heights. We spec cabinet boxes and finishes accordingly – cabinet-grade plywood over particleboard for anything near a window, and a moisture-resistant finish on the toe kick and under-sink cabinet. It adds cost; it also means the cabinets don’t swell after two winters.
Older homes have irregular walls. A 1910 Victorian’s wall is rarely square. Cabinet installers who put a level line on old plaster and call it done end up with visible gaps. We scribe and shim, which is a slower install but the doors sit flush.
Countertop templating matters more than the slab brand. A Cambria or quartz slab is only as good as the template. We template on-site after the cabinets are set, not from a drawing, because a 1/8-inch mistake at the template becomes a visible seam on the install.
Landmark and historic districts. Some San Francisco properties fall under exterior or interior review depending on the district. Cabinet and countertop replacement usually doesn’t trigger review, but if you’re in a historic district and especially if the kitchen is visible from the street through a window, it’s worth a check before ordering. We’ll flag it in the walk-through.
Appliance panels and integrated appliances. If you’re integrating a panel-ready refrigerator or dishwasher, the cabinet ordering timeline extends – those panels are made to spec and don’t come off a shelf. We plan the lead time into the schedule.
If your project also touches tile, plumbing, or lighting, that’s where the fuller Kitchen Remodeling scope comes in.
FAQs – Cabinets & Countertops
How much does cabinet and countertop replacement cost in San Francisco?
Most San Francisco cabinet and countertop projects land between $9,500 and $28,000, with a mid-range kitchen typically running $14,000 to $19,000. The low end is stock or semi-custom cabinets with a laminate counter; the high end is custom cabinetry with a full quartz slab and layout changes. Call (844) 797-6388 for an exact number – estimates are free and written.
Can you install cabinets and countertops the same week?
No, and nobody reliable can. Cabinet lead times run 3 to 8 weeks depending on the line; quartz countertops are templated after cabinets are set and fabricated in 5 to 10 business days once templated. A realistic full project window from order to final walk-through is 6 to 10 weeks. Anyone promising a full cabinet and countertop install in a week is either installing stock cabinets on a rushed template or hasn’t done the math.
Is it cheaper to refinish my existing cabinets or replace them?
Refinishing is cheaper – typically $3,000 to $7,000 for a full kitchen – but only if the cabinet boxes are structurally sound and the layout works for you. Once a box has water damage, or the doors won’t sit square because the frame has moved, refinishing just puts a fresh coat on a failing structure. We’ll tell you honestly which side of that line you’re on during the walk-through. Call (844) 797-6388 and we’ll take a look.
Do you offer a warranty on cabinet and countertop work?
Yes. Every cabinet and countertop project is covered by the 365-Day Done Right Promise: if it isn’t right within a year, we make it right. The warranty is in writing, not an asterisk. The install itself is also backed by the manufacturer warranty on the cabinet line and the countertop slab, and we walk you through both at the final walk-through.
What cabinet and countertop brands do you work with?
KraftMaid and Wellborn are our two most common cabinet lines, and Cambria is our most-requested quartz countertop brand. We source from more than fifty vetted material brands across our trades, and the written quote always names the specific line and finish grade – not a vague allowance.
If you’re ready to get a real number, call (844) 797-6388 for a free estimate. Bring a competitor’s written quote and we’ll review it line by line at no charge. Every crew member is background-checked and uniformed, a live person answers the phone 24/7, and every visit comes with a documented photo record included as standard. Rowan Construction Group San Francisco – written price before any work starts, every time.
Written by the team at Rowan Construction Group San Francisco, serving San Francisco.


